Monorails In Japan: An Overview

publictransit.us Special Report No. 9

Leroy W. Demery, Jr. June 22, 2005

Copyright 2002-2005, Leroy W. Demery, Jr

Abstract

Japan has ten monorail lines with a total route length of about 110 km (70 mi) , worked by more than 300 vehicles, carrying about 500,000 passengers per day. Several short lines were built during a long formative period. Most of these have been closed (6 km / 10 mi total), but monorail technology was proven practical. Two large-scale prototypes were built, including the well-known Tôkyô Monorail. Design standards for supported and suspended monorails were adopted, and criteria for application were established. Practical considerations have limited monorails to special-purpose applications, where surface right-of-way is not available and traffic is not sufficient to justify full-scale rail lines, either in tunnel or on viaduct. (No meaningful distinction between "light rail" and "heavy rail" can be made in Japan.) Most monorail lines were built along new expressways and surface roads. At mid-2005, the only active monorail projects were short extensions to three existing systems. No "new" monorail systems were under planning, according to Japanese-language sources. By contrast, many new rail lines were under construction or planned. There was also considerable interest in "LRT," which in Japan refers to modern tramway systems using low-floor cars. Japanese monorail lines will continue to expand, if slowly, but play a very small role in the overall transport picture. Conventional rail will remain the dominant mode for major urban corridors for the foreseeable future.

I. Introduction

This paper was written to provide information and statistics regarding monorail development in Japan, derived from Japanese primary sources, i.e., in the Japanese language. Only those lines classified formally as "Monorail" ( モノレール ) are included herein. A companion paper will cover those lines classified as "New Transport System" ( 新交通システム ), e.g. the "Skyrail Service" ( スカイレールサービス ) monocab line near Hiroshima. Monorail operating statistics for the 2003 fiscal year are presented in Table 1.

The Japanese experience demonstrates that the technology is workable and reliable, and suitable for application in a variety of urban and suburban travel markets. However, practical considerations have limited monorails to special-purpose applications, and there is little current prospect for significant expansion. Existing lines were built primarily along new expressways, in corridors where the cost of full-scale heavy-rail construction could not be justified. The Japanese-language literature contains no hint that any "new" monorails will be authorized as near-term or medium-term projects. At June 2005, following completion of the Naha monorail and a short extension in Tôkyô , the only active monorail projects in Japan were short extensions planned in Ôsaka and Chiba.

Monorail development in Japan has occurred in three phases. First, several short lines were built to demonstrate monorail technologies. Most of the early lines, built to serve amusement parks, expositions, or other recreational destinations, have been closed but one new "recreational" line has opened recently. Two full-scale prototypes, the Tôkyô and Shônan monorails, were also built during the formative years and remain in operation. Next, an industry association adopted standards for supported and suspended monorails. In addition, planners developed criteria for application of various urban transit modes. The third stage of monorail development, the gradual application of these two "standard" configurations, began during the mid-1980s. This did not mark the beginning of a monorail "revival," but rather the beginning of practical application. (There could hardly be a "revival" for a mode that never fell out of favor, but instead resembled a "solution in search of a problem" for many years.)

"Alternative" transport technologies tend to attract considerable attention from overseas, and some sources tend to overstate the role of monorail and other intermediate-capacity systems in the overall Japanese transport picture. Other, less exotic systems play a much larger role. For example, Japan began developing small-profile linear-motor metro (subway) trains during the 1980s. The idea was to reduce construction costs by reducing tunnel diameter. Ôsaka opened the first such line in 1990, followed by Tôkyô and Kôbe; the total route length is now significantly greater than that for all monorail lines yet built in Japan. Additional small-profile metros are being built in Fukuoka, Ôsaka, Sendai and Yokohama.

TABLE 1: JAPANESE MONORAIL OPERATING STATISTICS, 2002 FISCAL YEAR

Operator

Route Lengthkm / mi

Vehicle-km / vehicle-mi (annual)

Staff Members

Passengers per Day (average)

Increase       (or decrease) from 1985   (percent)

Density  (passenger-km (mi) per route-km (mi)  per day)

Chiba

15.2

9.4

2,601,000

1,613,000

178

44,000

opened 1988

11,801

Inuyama - Nagoya RR

1.2

0.7

82,000

51,000

7

2,000

nil

1,240

Kitakyûshû

8.8

5.5

2,633.000

1,632,000

140

31,000

22

17,303

Maihama

5.0

3.1

2,249,000

1,394,000

178

53,000

opened 2001

26,699

Naha

12.9

8.0

   

(est.) 29,000

opened 2003

(est.) 11,000

Ôsaka

23.8

14.8

6,903,000

4,280,000

186

79,000

opened 1990

22,028

Shônan

6.6

4.1

1,877,000

1,164,000

100

28,000

26

14,356

Tôkyô

Monorail

16.9

10.5

18,050,00

11,190,000

308

136,000

54

92,732

Tôkyô

Tama

16.0

9.9

5,424,000

3,363,000

202

97,000

opened 1998

33,634

Tôkyô Toei

Ueno Park

0.3

0.2

21,000

13,000

6

2,500

(38)

3,043

Japanese urban transport systems operate in a much different economic environment than in the U.S. Auto operating costs in Japan are very high. At mid-2003, regular gasoline cost roughly $3 per gallon. Most autos (including the sport utility vehicles built for the domestic market) are very small by U.S. standards, offsetting high fuel prices to some degree. In large cities, most hotels, some restaurants and most department stores provide free parking for customers. Metered on-street parking cost about $2 per hour, and parking structures charged $3 - $7 per hour (in central Tôkyô, parking costs up to twice as much) . Suburban retail outlets and mini-malls, together with parking lots, have proliferated rapidly since 1980. Such development tends to occur around smaller cities and towns, where land is cheaper.

TABLE 2: JAPANESE MONORAIL FINANCIAL RESULTS, 2002 FISCAL YEAR

Operator

Operating Receipts

Operating Expenses, ¥

Operating Profit (or loss), ¥

Chiba Urban Monorail Co., Ltd.

3,158,000,000

4,160,000,000

(1,002,000,000)

Inuyama - Nagoya RR Co., Ltd.,

Monkey Park Monorail

89,000,000

114,000,000

(25,000,000)

Kitakyûshû Rapid Railway Co., Ltd.

2,254,000,000

1,945,000,000

309,000,000

Maihama Resort Line Co., Ltd.

3,643,000,000

4,438,000,000

(795,000,000)

Okinawa Urban Monorail Co., Ltd.

opened 2003

   

Ôsaka Rapid Railway Co., Ltd.

7,414,000,000

6,091,000,000

1,323,000,000

Shônan Monorail Co., Ltd.

1,678,000,000

1,477,000,000

201,000,000

Tôkyô Monorail Co., Ltd.

14,734,000,000

12,138,000,000

2,596,000,000

Tôkyô Tama Intercity Monorail Co., Ltd.

5,893,000,000

6,937,000,000

(1,044,000,000)

Bureau of Transportation,

Tôkyô Metropolitan Government (Toei)

Ueno Park monorail

107,000,000

108,000,000

1,000,000

Notes for Table 2 :

Conversion between currencies may introduce considerable uncertainty, because of exchange-rate fluctuations. Financial data are therefore presented without conversion.

Japan has no "freeways," and expressway tolls are very high. The flat toll for travel on the Tôkyô metropolitan expressway network was about $6.00 at early 2002. In Nagoya, the flat toll was about $5.00. Intercity expressway tolls ("intercity" includes short trips such as Tôkyô - Yokohama) cost about $0.12 per km ($0.20 per mi) . The 524-km (325-mi) trip between Tôkyô and Kyôto, for example, cost about $75 for tolls alone. By comparison, the same trip cost about $110 by shinkansen (high-speed rail) or about $70 by local train. Bridge tolls are also very high. The "Tôkyô Bay Aqualine" bridge-tunnel charged $25 per car, or $20 per small car, at early 2002. However, the Kawasaki - Kisarazu bus service, crossing the same bridge, charged less than $12 per passenger.

Notes on Transcription

Transcription of Japanese into the Latin alphabet raises a number of issues. Two distinct systems are currently in use, which are similar but not identical. In addition, Japanese script makes no distinction between capital and lower-case characters, and Japanese is not normally written with spaces or hyphens. There are also no "rules" on how, or if, long vowels should be indicated in romanized form ( rômaji ), no agreement on how to spell foreign loanwords, and so forth. The author has used the Modified Hepburn ( Hebon-shiki ) system herein, with long-vowel symbols, adding capitals and hyphens as appropriate (using an ad-hoc style devised in collaboration with J. Wallace Higgins). The author has also used mean-value symbols (<>) to set apart foreign loanwords as appropriate (e.g. <monorail>). Spellings of Japanese personal names in the Latin alphabet may differ from those preferred by the authors cited.

Some World Wide Web sites require Japanese-compatible browsers and software for proper display of text. However, graphics and photos are usually displayed even when text appears as gibberish because of compatibility problems. Some Japanese websites have "English" versions, but these seldom contain more than a fraction of the information available in Japanese.

Other Details

All schedule and fare information is current as of February 2002, except for the Naha monorail, which is current to the time of opening (August 2003).

Conversions from Japanese yen to U.S. dollars were based on the rate current at November 2002: ¥120 = US$1.00. Readers are reminded that exchange-rate fluctuations may introduce considerable uncertainty when prices are converted between currencies.

TABLE 3: ANNUAL TRAFFIC DATA FOR MAJOR JAPANESE MONORAILS

Fiscal Year

Tôkyô

Kita-kyûshû

Ôsaka

Tama

Maihama

Naha

Shônan

Chiba

Total

Average Daily Pass-engers

1964

2,475

             

2,475

12.6

1965

2,743

             

2,743

7.5

1966

3,312

             

3,312

9.1

1967

6,438

             

6,438

17.6

1968

8,159

             

8,159

22.4

1969

11,348

         

136

 

11,484

31.5

1970

15,157

         

172

 

15,329

42.0

1971

17,440

         

3,997

 

21,437

58.7

1972

20,017

         

5,355

 

25,373

69.5

1973

23,681

         

6,630

 

30,311

83.0

1974

25,998

         

7,331

 

33,329

81.3

1975

28,945

         

7,293

 

34,238

93.8

1976

28,788

         

7,578

 

36,366

99.0

1977

30,775

         

7,535

 

38,310

105.0

1978

26,017

         

7,750

 

33,767

82.5

1979

25,405

         

7,621

 

34,027

93.2

1980

26,539

         

7,916

 

34,455

94.4

1981

27,942

         

7,691

 

35,633

97.6

1982

28,118

         

7,724

 

35,842

88.2

1983

28,440

         

7,820

 

36,260

99.3

1984

31,269

2,706

       

8,060

 

42,035

115.2

1985

31,984

9,987

       

8,079

 

50,050

137.1

1986

33,957

10,135

       

8,324

 

52,416

143.6

1987

35,707

9,529

       

8,615

60

53,911

147.7

1988

37,637

9,291

       

9,239

3,604

59,771

163.8

1989

41,523

9,237

       

9,768

4,952

65,480

179.4

1990

44,574

9,750

4,700

     

10,328

5,549

74,901

205.2

1991

47,127

10,408

7,365

     

10,772

10,425

86,097

235.9

1992

51,081

11,143

7,827

     

11,298

12,451

93,800

257.0

1993

57,013

11,691

8,373

     

11,346

13,279

101,702

278.6

1994

61,364

11,846

8,766

     

11,165

13,274

106,345

291.6

1995

62,006

11,424

10,523

     

11,073

15,450

110,476

302.7

1996

64,693

11,181

10,992

     

11,107

16,689

114,662

314.1

1997

65,208

11,047

21,485

     

10,939

16,465

125,144

342.9

1998

63,148

12,346

26,298

2,387

   

10,848

16,061

131,088

359.1

1999

53,905

12,485

27,591

11,059

   

10,553

16,654

132,247

362.6

2000

51,413

12,148

28,499

29,132

   

10,429

16,482

148,053

405.6

2001

50,341

11,587

28,425

33,834

17,377

 

10,362

16,178

168,104

460.6

2002

49,532

11,497

29,016

35,512

19,375

 

10,088

16,059

171,079

468.7

2003

46,688

11,528

28,745

37,528

18,123

 

10,128

15,940

168,680

462.1

2004

                   

2005

                   

Total

1,366,938

210,966

248,605

149,452

54,875

 

295,181

209,520

2,537,537

 

Notes for Table 3:

All data in thousands. “Average Daily” traffic is annual total divided by 365, per Japanese convention.

Column totals may differ from sum of individual entries due to rounding.

“Average Daily” traffic for 1964, which included only the Tôkyô Monorail, adjusted to reflect opening on September 17, 1964, nearly halfway through the fiscal year which began on April 1, 1964.

Sources:

都市モノレール年間来客数の推移 toshi <monorail> nenkan raikyakusû no sui i,

都市モノレール計画 toshi <monorail> keikaku , Japan Monorail Association.

II. The Monorail Market Niche

Boudalon's concept of the "transport gap" refers to situations where traffic levels are too high for efficient bus operation, but too low to justify full-scale conventional rail lines (Bouladon 1967.4; 1967.10). Japanese planners have identified a need for "intermediate-capacity" transit systems, able to carry 5,000 - 15,000 passengers per hour, with an average travel distance in the range of 3-15 km (2-9 mi) , at (passenger) speeds in the range of 20-40 km/h (12-25 mph) . The need is to provide faster travel times than buses in mixed traffic (which are often very slow in Japan), a high service frequency, and high service reliability for medium-sized cities, for links to new suburban development, and for connections between suburbs where underground metro construction cannot be justified.

These criteria are remarkably similar to the "field of application" for light rail transit (LRT) in the U.S. and Canada. However, urban land is costly and scarce in Japan. New surface rail alignments are almost prohibitively expensive (Kikuchi and Ohta 1989). Land has been reserved for future rail development in some locations, typically new suburban development in the largest metropolitan areas, but this is not the typical practice elsewhere. Except for short freight branches, abandoned rail corridors are essentially nonexistent in large Japanese cities. All that have ever existed remain in service (or were built over decades ago following abandonment). A few freight lines serving large cities (Nagoya and Ôsaka) are planned for rebuilding as passenger lines, but as electrified suburban railways, not U.S.- or Canadian-style LRT.

Finding roads wide enough to build a conventional "full-scale" rail line on viaduct is extremely difficult. Required overall road width, permitting space for columns and stations, is 25 meters (82 feet) between stations, and 35 m (115 ft) at stations. This is for a full-scale "conventional" railway on viaduct, with roadways on either side. The problem is that most Japanese cities have very narrow streets. In large cities, the typical residential street is no wider than the typical alley in U.S. cities. Few major roads are 25-35 m (82-115 ft) wide. Of the largest cities, only Nagoya undertook large-scale street widening during postwar reconstruction.

Since the modest beginnings Japan's streetcar (tramway) revival during the 1990s, the label <LRT> has come into use with reference to streetcar lines, built in streets but with track areas reserved, using modern cars providing low-floor ( バリアーフリー <barrier free> ) access. Although there is much in common, <LRT> as a concept in Japan is quite distinct from "light rail transit" as built in the U.S. and Canada. Nor, for historic and legal reasons, is there any meaningful distinction between "light rail" and "heavy rail" in Japan. Under Japanese law, rail lines are licensed as "railways" ( 鉄道 tetsudô ) or "tramways" ( 軌道 kidô ). The principal distinction between the two is that a "tramway" may be built within the alignment of a public road. Another distinction: "railway" lines invariably use car-floor level platforms at all stations, but "tramway" lines may use low platforms or ground-level loading. A 1921 law limits the maximum "tramway" vehicle or train length to 30 m (98 ft ) and to a maximum speed of 40 km/h (25 mph) when operating in streets.

The "tramway" and "railway" categories are not immutable: many large private-sector operators in major cities were built under "tramway" concessions, and were later re-licensed as "railways." The "tramway" heritage of such operators becomes immediately apparent to knowledgeable observers, who will note that lines built as "tramways" use European standard (1,435mm = 4' 8 1/2" ) or Tôkyô tramway (1,372mm = 4'6" ) gauge, rather than the usual Japanese standard gauge (1,067mm = 3'6" ). Other "tramway" characteristics include close spacing between stations and many grade crossings. Nor are other "rules" immutable: Ôtsu is linked to nearby Kyôto by an upgraded "tramway" line, which now gains access to central Kyôto over metro tracks. This line has a short section of street track in central Ôtsu. The Transport Ministry issued a special license to permit operation of four-car trains of metro-type rolling stock over this segment.

If built in Japan, a line with high platforms throughout and no street running would not be classified as "LRT," but as a "regional railway." U.S. examples include the St. Louis MetroLink LRT line and the LRT Green Line in Los Angeles. Japan has several examples of similar lines, licensed as "railways," that are never listed as "tramways" or <LRT> . Lines similar to those built recently in the U.S. and Canada might well be licensed as "railways" in Japan.

The major stated disadvantage of monorail, compared to <LRT> or other rail lines, is inability to operate in a network:

"Thus, system expansion and future integration with other monorail lines to form a network with vehicles traveling from one line to another cannot be expected" (Kikuchi and Ohta 1989).

Operators in Chiba and Ôsaka have since demonstrated that operation of monorail networks is practical, at least on a very limited scale. Another disadvantage: If a monorail is built underground or in a tunnel, the required vertical clearance is at least 5.6 m (18’ 5”) , compared to 3.2 m (10’ 6’) for <LRT> (Kikuchi and Onaka 1988).

Other factors have stimulated interest in monorails and other intermediate-capacity transit systems. Among these has been strong pressure to reduce the weight of trains in order to reduce the size, and cost, of support structures. In Japan, <New Transport System> ( 新交通システム ) or <NTS> refers generally to elevated lines using relatively small, rubber-tired rolling stock, although other technologies are now classified as <NTS> . Some Japanese authors also use the term AGT, "Automated Guideway Transit," when writing in English. This is something of a misnomer because some such lines use manually driven trains.

Since 1972, road construction funds have been available for transit "guideways" so long as this is constructed within the road alignment:

"This is based on the concept that the transit system is part of the road and helps alleviate the traffic congestion on the roadway, and thus, encourages the utilization of transit to complement the people carrying capacity of the corridor" (Kikuchi and Ohta 1989).

State and local authorities share the infrastructure cost, up to 44.9 percent of the total cost. This has encouraged construction of monorail and other ICTS lines along roadways, particularly when these roads are widened and improved.

By contrast, no large-scale funding has been provided for improvement of urban bus and tramway (streetcar) systems. (At the end of the 1990s, the state provided funds to pay part of the cost of an urban tramway extension; it had not done so before.). This situation has encouraged development of new technology rather than gradual upgrading of existing systems. Nagoya has made the most significant investment in upgraded bus systems. Its Key Route Bus System ( 基幹バス kikan <bus> ) services include reserved lanes, traffic signal priority, and widely spaced stops. However, Nagoya is probably the only large Japanese city (other than Hiroshima) able to implement such measures. A new, elevated <Guideway Bus> ( グイドウェイバス ) or guided busway line opened in 2001.

New transit systems have "novelty" and "symbolism" appeal, particularly for newly-developed suburbs. Kikuchi and Ohta (1989) emphasize this point:

"Novelty and symbolism play an important part of the decision process. This tendency is particularly manifested in Japan."

Unfortunately, these authors provide no elaboration, and lines built primarily for "novelty" and "symbolism" tend not to show favorable financial results.

Division of responsibility between ministries also spurred a proliferation of monorails and <NTS> systems. The Construction Ministry responsible for roads, tended to favor various rubber-tired systems and monorails, while the Transport Ministry, responsible for railways, favored conventional rail lines. The new Ministry of Land, Infrastructure and Transport is responsible for airports, rail lines of all types and roads.

III. Monorail and Other Modal Specifications

Intermediate-capacity transport systems in Japan include monorail, "new transport systems," and <LRT> .

"Monorail" is defined as traveling along a single guideway, on rubber tires, either straddling the guideway or suspended from it. Advantages over conventional rail include: less land requirement, and an ability to negotiate steeper grades and sharper curves, making construction within the alignment of existing roads more practical.

Recent monorail specifications include (Nehashi 1998):

--Construction cost: $30-60 million / km ($50-100 mn per mi) for infrastructure; $25-55 million / km ($40-90 mn per mi) for equipment and rolling stock.

--Commercial (schedule) speed: 30 km/h (19 mph) .

--Maximum capacity: 26,000 passengers per hour per direction (phd). This is based on 6-car trains, 2-minute headways, and 95 passengers per vehicle (p/v), about 6.1 passengers per meter of vehicle length (p/m).

Outside of the four most crowded and congested urban centers (Boston, Montréal, New York and Toronto), U.S. and Canadian consumers do not tolerate the levels of peak-period crowding aboard transit vehicles that may be observed in many Japanese cities. Therefore, a similar service level, with identical vehicles, in most U.S. or Canadian urban corridors, would carry significantly less traffic: no more than 17,000 - 20,000 phd, assuming the existence of sufficient demand.

--Average annual operating cost for monorail is estimated at $2 million / route-km ($3 mn per rt-mi) . Thus, a monorail line would need to attract 4,000 passengers per route-km per day (pkd , or 6,500 per rt-mi, pmd ), each paying an average fare of $1.25, in order to cover operating costs.

Comparative figures for underground metros (subways):

---Construction cost: $210-250 million / km ($340-400 mn per mi) , or $170-175 million / km ($270-280 mn per mi) for small-profile underground metros.

---Commercial speed: 32 km/h (20 mph) , or 34 km/h (21 mph) for small-profile lines, probably because of higher acceleration rates.

---Maximum capacity: 64,000 phd (24,000 - 30,000 phd in most U.S. or Canadian corridors, assuming the existence of sufficient demand). This is based on 10-car trains, 2-minute headways, and 214 passengers per vehicle, about 10.7 passengers per meter of vehicle length.

---Maximum capacity for a small-profile metro is 35,000 phd, based on 8-car trains, and 146 p/v, about 8.9 p/m (16,000 - 20,000 phd in most U.S. or Canadian corridors).

---Average annual operating cost: $6 million / route-km ($9 mn per route-mi) , requiring 12,200 pkd (19,700 pmd) , each paying an average fare of $1.25, to cover operating costs.

Comparative figures for "New Transport Systems" ( <NTS> or "Automated Guideway Transit"):

---Construction cost: $30-80 million / km ($50-130 mn per mile) for infrastructure; $25-55 million / km ($40-90 mn per mile) for equipment and rolling stock.

---Commercial speed: 27 km/h (17 mph) .

---Maximum capacity: 18,000 phd (6,000 - 8,000 phd in most U.S. or Canadian corridors, assuming the existence of sufficient demand). This is based on 6-car trains, 2-minute headways, and 98 p/v, about 11.5 p/m.

---Average annual operating cost: $2 million / route-km ($3 mn per rt-mile) , requiring 4,000 pkd (7,000 pmd) , each paying an average fare of $1.25, to cover operating costs.

As noted above, <LRT> refers essentially to high-performance tramway lines providing <barrier-free> passenger access, operating on tracks built in roads but separated from other traffic. Comparative figures for <LRT> :

---Construction cost: $27 million / km ($44 mn per mi) .

---Commercial speed: 19-26 km/h (12-16 mph) .

---Maximum capacity: 14,000 phd (6,000 - 8,000 phd in most U.S. or Canadian corridors, assuming the existence of sufficient demand). This is based on two-car trains (or single articulated cars), 2-minute headways, and 225 p/v, about 8.9 p/m.

---Average annual operating cost: $1 million / route-km ($1.5 mn per rt-mi) , requiring 2,100 pkd (3,400 pmd) , each paying an average fare of $1.25, to cover operating costs.

IV. Criteria For Application

Japan has established practical fields of application for various urban transit modes, including monorail." The "domain of efficiency" for each mode has been worked out, based on technical and economic factors. The criteria are very well defined (Nehashi 1998) but defy straightforward explanation. U.S. planners and decision makers tend to overlook the fact that transportation "workload," or traffic density, depends on both the number of people who travel and the average distance traveled. This workload is measured in terms of passenger-km (mi) per km (mi) of route. This simply refers to the number of people, on average, who travel over each kilometer (mile) of guideway (in both directions) during some interval. The traffic-density statistic used in Japan is an annual average per calendar day, not per weekday. It should be noted that traffic density statistics do not change in value when converted from "passenger-kilometers per kilometer of route" to "passenger-miles per mile of route."

A large daily passenger count is generally required to justify a short-distance fixed-guideway facility. On most such facilities, the average travel distance (ATD) is low relative to the route length (e.g. ATD is 20-30 percent of route length). As a consequence, traffic density is relatively low, and operating cost per passenger-mile relatively high. By contrast, on many longer facilities, ATD is high relative to the route length (e.g. ATD is 60-70 percent of route length). Traffic density is also relatively high, and operating cost per passenger-mile relatively low. The longer facility therefore does not require such a large daily passenger count to justify its construction. This would be true from the standpoint of operating efficiency even if passenger revenue were not considered. (In Japan, distance-based or "stage" fares are long-established and universally accepted.)

It is possible to design a fixed-guideway facility that cannot carry enough passengers to justify its construction, because of insufficient traffic density. The best example, in the Japanese context at least, is personal rapid transit (PRT).

Summarizing the Japanese modal criteria for urban transportation:

Individual transportation is considered adequate for all trips shorter than 1 km (0.6 mi) , and for all trips along corridors where the one-way traffic density is less than 2,000. Moving sidewalks might be provided in locations where traffic volume is great enough to justify the investment.

For example, no public transportation would be provided where ATD was 2 km (1 mi) and the daily (two-way) traffic volume was less than 1,500 passengers (or, more correctly, boardings) per route-km (2,500 per rt-mi) .

Japanese transportation literature emphasizes that buses provide no economies of scale. Given a 2-km (1-mi) ATD, buses are economical for traffic volumes up to 3,000 daily boardings per route-km (5,000 per rt-mi) .

At higher volumes, bus operation becomes uneconomical, because economies of scale are lacking. However, the minimum threshold for conventional urban railways (given a 2-km (1-mi) average trip length) is 8,000 boardings per route-km (12,500 per rt-mi) per day.

These "thresholds" change drastically as average trip length changes - again, because of economies of scale.

One critical fact is often overlooked in the U.S.: if ATD increases, more service (vehicle-km (veh-mi) ) must be operated, even if "ridership" (boardings per route-km (rt-mi) ) does not change. If additional service is not provided, then average vehicle occupancy will increase (more passenger-km (pass-mi) per route-km (rt-mi) ), and by implication peak period crowding will also increase.

Given a 3-km (5-mi) ATD, public transport becomes viable with fewer than 300 boardings per route-km (500 per rt-mi) per day. Buses become uneconomic with more than 500 boardings per route-km (750 per rt-mi) per day, but conventional railways are not justified with fewer than 1,200 boardings per route-km (2,000 per rt-mi) per day. The standard Japanese transit bus is about 11 m (35 ft) long, 2.4 m (8 ft) wide and seats 28 passengers. The "maximum load" established under transport laws is 74 passengers, or 6.9 passengers per meter of vehicle length. Articulated buses are not used for urban transport services in Japan.

Under the Japanese criteria, it is more cost-effective to build a railway than operate buses given the following parameter range:

400 daily boardings per rt-km (700 per rt-mi) , ATD 10 km (6 mi) , to

80 daily boardings per rt-km (130 per rt-mi) , ATD 50 km (31 mi) .

Express buses (known as ハイウェイバス , <Highway Bus> , in Japan) are efficient only for longer trips. If the daily boarding count exceeds 120 passengers per route-km (200 per rt-mi) , high-speed rail becomes more efficient.

It is essential to keep these numbers in context. A suburban rail line handling an average travel distance of 50 km (31 mi) would be longer than 50 km (31 mi) end-to-end. The minimum daily "boarding count" required to justify an 80-km (50-mi) suburban rail line becomes 6,500. Converting from "average daily" to "average weekday" ridership in line with U.S. practice, this implies more than 8,000 boardings per weekday.

It is also essential to keep in mind that these criteria were developed with reference to Japanese economic conditions. Longer trips require operation of more vehicle-km per passenger, and so the "economy of scale" effect reduces the boarding "threshold" required to justify rail lines as average trip length increases. Buses, by contrast, provide no such economies of scale.

V. Small-Scale Installations

Japan's first monorail proposal was submitted in 1913, for a short line in Tôkyô. This was to extend between Ueno station and Asakusa, using technology patterned after Germany’s Wuppertaler Schwebebahn . Ten more monorail proposals followed between 1923 and 1931. All were rejected by transport officials skeptical of the technology, the ability of the promoters to secure financing, and other claims, including ridership estimates.

東京 T ō ky ō 豊島園 Toshima-en amusement park (1951-?)

An 0.2-km (0.1-mi) suspended monorail opened at Toshima-en amusement park, in Tôkyô's northwest suburbs, in 1951. Rolling stock was built by Hitachi. This little-known line was not much more than an amusement-park ride, and was dismantled some years ago. Other small-scale monorail lines have since been built to serve non-public transport functions (e.g. at amusement parks and golf courses).

東京 T ō ky ō 上野懸垂線 Ueno Suspended Line (Ueno Park)

In 1957, the Bureau of Transportation, Tôkyô Metropolitan Government ( 東京都交通局 tôkyô-to kôtsû-kyoku , often abbreviated 都営 Toei ), which operates surface transport and the smaller of Tôkyô's two metro networks, built a demonstration monorail line in Tôkyô's Ueno Park. This extends 0.3 km (0.2 mi), and connects the east and west sections of Ueno Zoo. It was patterned after the Wuppertaler Schwebebahn , although with rubber-tired “bogies” ("trucks") and a much smaller single-beam guideway. Toei used tramcar hardware when possible. Traction current is supplied at 600V dc. The line provides a commercial speed of 11 km/h (7 mph) . Rolling stock is built to "half scale" - 9.3 m (30' 6") long and 1.7 m (5' 7") wide. The line has a single two-car train. The nominal construction cost (without attempting to adjust for inflation) was ¥200 million ($550,000) .

It is not clear what potential applications were considered. One proposal called for construction of monorails together with the urban tollway network, but this was not carried out. Replacement of major streetcar lines with monorails as an alternative to metros may have been an early idea, but this was not considered seriously for long.

This tiny line has operated successfully for nearly 50 years, and currently carries an average of 2,500 people per day. It proved wholly inadequate for busy urban trunk lines, but serves a useful purpose and has become something of a technological monument. Rolling stock was replaced in 1967 and again in 1984-1985. Closure was threatened at the end of the 1990s, following a Transport Ministry inquiry regarding earthquake-safety standards, adopted after the 1997 Kôbe earthquake. The agencies responsible decided eventually to rebuild the line, and it was closed from January 2000 through the end of May 2001 to permit this. It currently operates during zoo opening hours; the one-way fare is $1.25 (admission to the zoo is $4.20).

奈良 Nara 奈良ドリームラン Nara Dreamland

Nara Dreamland, opened in 1961, was an attempt to replicate the original Disneyland theme park at Anaheim, CA, opened in 1955. Developers are said to have sought, without success, cooperation from Walt Disney Productions. Disney is said to have been furious when the project proceeded nonetheless. The 0.8-km (0.5-mi) , figure-eight monorail loop, equipped by Tôshiba, was the first full-scale monorail in Japan and the first to use precast concrete beams. However, it was not licensed as a public-transport facility. The trains, lettered <SPACELINER> , bear a superficial resemblance to Disney monorail stock. Several of Japan's older and smaller amusement parks have closed recently, because of competition from newer, flashier theme parks and the country's decade-long recession. However, Nara Dreamland is a subsidiary of the Daiei supermarket chain, and its future appears secure.

犬山 Inuyama

名古屋鉄道モンキーパークモノレール線

nagoya tetsudō <monkey park monorail> sen

Nagoya Railroad Co., Ltd., Monkey Park Monorail Line

Supported system: Inuyama-yûen ( 犬山遊園 ) to Dôbutsuen ( 動物園 ) , 1.2 km (0.7 mi) . Opened 1962.

------------------------------

The Hitachi group licensed Alweg monorail technology in 1960, and this became the first Hitachi-<Alweg> ( 日立アルウェーグ ) monorail.

Meitetsu ( 名鉄 "May-tets") is a Sino-Japanese style abbreviation referring to the Nagoya Railroad Co., Ltd. ( 名古屋鉄道 nagoya tetsudô ), the second-largest non-JR private-sector railway in Japan. "Japan Monkey Park" ( 日本モンキーパーク ) known previously as Meitetsu <Monkey Park> ( 名鉄モンキーパーク ), is a company-owned zoo and recreational facility, noted for its collection of monkeys. The single-beam monorail extends between Inuyama-yûen station, on the company's Inuyama Line, and the zoo. A single intermediate station serves a Shingon Buddhist temple, Inuyama Narita-san ( 犬山成田山 ), which attracts large numbers of visitors on special occasions such as New Year's Day. The zoo provides a traffic base to support infrastructure that proves very useful on peak-traffic days.

Meitetsu began developing recreational facilities near Inuyama in 1925. One of these, opened in 1955, was a nature park, <Picnic Land> ( ピクニックランド ) later renamed <Rhein Park> ( ラインパーク ; a section of the Kiso River near Inuyama was christened 日本ライン Nihon <Rhein>, "Japan Rhine," by a geologist inspired by the sight of Inuyama Castle perched on a hill overlooking the river.)

Transportation to Inuyama-yûen station was provided by a bus service, creatively named Momotarô Line ( 桃太郎線 ; 桃太郎 Momotarô , "Peach Boy," is the hero of a well-known Japanese folk tale). Then, in 1958, the company opened a 1.2-km (0.7-mi) miniature railway, おとぎ停車 otogi-teisha ("Fairy Train") from the eastern edge of Inuyama to the park. Development continued, and the zoo was opened in 1962. The company considered a full-scale railway branch but decided on the monorail. The nominal construction cost (without attempting to adjust for inflation) was ¥500 million ($1.4 million) . The line has grades to 9.7 percent (1 in 10) , and one section is built in a cutting. Traction current is supplied 1500V dc. The two aluminum-bodied trains can be coupled. The line provides a commercial speed of 18 km/h (11 mph) . Ridership averages about 2,000 per day. The basic midday service operates every 30 minutes, with additional service during peak travel periods.

川崎 Kawasaki 読売 (よみうり)ランド Yomiuriland (1964-1978)

This 2.9-km (1.8-mi) circular Hitachi-Alweg line was built by the Kantô Race Club ( 関東レース倶楽部 ) in an area later developed as the Yomiuriland amusement park. The nine cars operated as three-car formations. Traction current was supplied at 600V dc. The maximum permitted speed was 40 km/h (25 mph) . The monorail closed near the end of 1978, a victim of "motorization." Much of the guideway now supports a one-lane roadway, with lateral safety barriers, for a self-drive go-cart ride. The remainder has been demolished and removed. The precise reason for closure is not known to the author, but was believed to stem from light traffic and high operating costs.

名古屋 Nagoya 東山公園 Higashiyama Park (1964-1974)

Nagoya planned metro construction from the mid-1930s but was not able to start construction until 1954. The initial 2.4-km (1.5-mi) segment opened at the end of 1957. By 1963, when municipal authorities decided to replace tramcars because of growing traffic congestion, it had completed only 6.1 km (3.8 mi) of metro extensions. Fulfillment of the six-route, 50-km (30-mi) metro plan announced in 1950 seemed years away.

Meanwhile, the municipal Engineering Bureau became interested in monorail development. Perhaps inspired by the Tôkyô's Ueno Park monorail, the city joined forces with the private sector in 1962 to build a demonstration line in Higashiyama Park. Nippon Airway Development Co., Ltd. ( 日本エアウエイ開発 nippon <airway> kaihatsu ), organized by Mitsubishi Heavy Industries and ten other firms in 1962, acquired license rights for Safege suspended-monorail technology in Japan. This enterprise was absorbed into parent Mitsubishi, apparently at an early stage. Mitsubishi Heavy Industries became the prime contractor and built the rolling stock, a single car. Construction started in 1963.

The 0.5-km (0.3-mi) single guideway connected Higashiyama Zoo ( 東山動物園 higashiyama dôbutsuen ) with Higashiyama Botanical Garden ( 東山植物園 higashiyama shokubutsuen ), and cost about ¥110 million ($300,000) to build. Rolling stock and other equipment brought the total cost to about ¥220 million ($600,000) . Traction current was supplied at 600V dc.

The line opened early in 1964, and averaged of 1,000 passengers daily. It attracted considerable media attention but mechanical problems hindered operation. These led to two four-day suspensions of operation during the first year.

It is not clear what potential applications were envisioned for monorail technology. Nagoya continued to build metro lines and replaced trams with motorbuses. Surface rail operation ended in 1974. No proposals for additional monorails were advanced.

Instead of a showcase, the Higashiyama monorail became a deficit-ridden orphan. It earned a profit during its first two years, but losses began in 1966. Efforts to restore profitability failed, and the municipal transport bureau eventually lost interest. Plans for expansion of the zoo and botanical gardens apparently hastened the end, which came at the end of 1975. The car and a short section of guideway are preserved in Higashiyama Park, but the remainder was dismantled and removed.

川崎 Kawasaki - 向ヶ丘 Muk ō gaoka (1966-2000)

小田急電鉄向ヶ丘モノレール線 odakyū dentetsu mukōgaoka <monorail> sen

Odakyū Electric Railway Co., Ltd.,

Mukōgaoka Monorail Line

This 1.1-km (0.7-mi) line connected Mukôgaoka-yûen ( 向ヶ丘遊園 ) station on the Odakyû main line with one of the company's many subsidiaries, the Mukogaoka amusement park (at Mukôgaoka-yûen-seimon 向ヶ丘遊園正門 monorail station). It was closed after Odakyû decided that required major repairs could not be justified.

In 1962, Kawasaki Heavy Industries, Ltd., (Kôbe) licensed the rail-on-beam supported monorail system developed by Lockheed Aircraft Corporation. A subsidiary, Nihon-Lockheed Monorail Co., Ltd. ( 日本ロッキードモノレール ), built a 0.8-km (0.5 mi) test line at the Kawasaki Aircraft Co., Ltd., plant near Gifu.

Odakyû opened its high-speed electric railway between Tôkyô (Shinjuku station) and Odawara, 82 km (51 mi) , in 1927. The amusement park, and a miniature railway linking it to the nearby Odakyû station, also opened in 1927. This used gasoline locomotives, and was closed in 1941 because of wartime fuel rationing. It was restored in 1951 with battery locomotives. The amusement park was located northwest of central Kawasaki, in an area that was once well beyond Tôkyô 's suburban fringe. Urban development encroached following World War II. Plans by Kanagawa Prefecture for a bypass road on the same alignment led to replacement of the miniature railway by the first commercial installation of a Nihon-<Lockheed> monorail. The nominal construction cost (without attempting to adjust for inflation) was ¥200 million ($550,000) .

The monorail had a single two-car train, which operated every 15 minutes when the park was open. The trip required just three minutes, providing a commercial speed of 23 km/h (14 mph) . Although equipped with resilient wheels, the train sounded much like a conventional rail vehicle when negotiating curves. It carried an average of 1,800 passengers during the 1980s, but traffic fell to 900 per day by the end of the 1990s.

A scheduled inspection in February 2000 discovered cracks in the running gear frame of one car. Operation was suspended while the company consulted the supplier. The running gear frames were judged to be life-expired, and Odakyû decided that the estimated ¥380 million ($3 million) cost could not be justified. Closure was made permanent in December 2001. The amusement park was closed early in 2002 because of declining attendance.

姫路 Himeji (1966-1974)

姫路市交通局 himeji-shi kōtsū-kyoku Himeji City Transport Bureau

This regional center about 55 km (35 mi) west of Kôbe is best known for its magnificent castle, built from 1581 and considered the finest in Japan. This stands about 1.5 km (1 mi) north of Himeji station. Another attraction stands southeast of the station: Tegarayama hill ( 手柄山 ), which has a monument to the victims of the 1945 firebomb attacks against Japanese cities, a library, a concert hall and other cultural facilities.

Plans for a regional exposition stimulated interest in a monorail link between Himeji station and Tegarayama. This idea attracted strong support from the city's Mayor. The city received authority to build from the Transport Ministry in 1964 and began construction in 1965.

A 1.6-km (1-mi) , single-beam Nihon-<Lockheed> line was built at a cost of about ¥1.8 thousand million ($5 million) , and opened in 1966. This had four cars, which could be coupled into trains of the desired length. Technical features included automatic train stop (<ATS>). Traction current was supplied at 600V dc. Two-car trains were standard, but three-car trains were operated during the exhibition. Service was provided every 15 minutes at first. The maximum permitted speed was 50 km/h (31 mph) , and the line provided a commercial speed of 24 km/h (15 mph) .

The Himeji Monorail carried an average of 1,000 passengers per day during its first year of operation, about one-third of the anticipated traffic. By 1968, when service was reduced to three trains per hour, traffic had fallen to 700 passengers per day. Operating losses and interest payments increased, and by 1970 a new Mayor sought to close the line. Proposals for extensions north to Himeji Castle and south to the city's passenger ship terminal attracted some support, but were not carried out. Operation was suspended in 1974, and closure was made permanent from 1979. The city announced in 1991 that the monorail beam would be dismantled, but this had not been carried out at early 2002.

横浜 Yokohama (1966-1967)

横浜ドリームランド Yokohama Dreamland

This was the last monorail built for purely excursion or leisure traffic during the formative years of Japanese monorail development. It extended northwest from Ôfuna ( 大船 ) station northwest to the Yokohama Dreamland amusement park, 5.3 km (3.3 mi) . A second stage was planned to extend from Dreamland to Mutsuai ( 六会 ) station on the Odakyû Enoshima Line, but was not built.

The parent company organized the Dream Transport Co., Ltd. ( ドリーム交通 <dream> kôtsû ) to build the monorail. It was equipped by Tôshiba and had three two-car trains. The line opened in 1966, but failed to attract the anticipated traffic. A Transport Ministry inspection in 1967 found defects, and the company decided that repairs could not be justified. Service was suspended after less than one year of operation. The parent company announced plans for reopening in 1993 but did not proceed. It then announced plans to replace the monorail with a new line using <HSST> magnetic-levitation technology, but this also did not advance. The company considered a small-profile monorail line from 2001, but this idea soon faded. The amusement park closed early in 2002 because of declining attendance. Then, in summer 2002, the parent company, Daiei, Inc, announced that it would relinquish its rights and formally abandon the monorail line. The Ôfuna station has been removed, but the guideway remained in place at early 2001.

大阪 Ō saka - Expo ‘70 (1970)

大阪万国博覧会 ōsaka bankoku hakurankai

Ōsaka Expo '70 world's fair association

This 4.4-km (2.7-mi) single-beam loop, although a temporary installation, marked an important stage in Japanese monorail development. It was the first built to uniform standards for supported monorails, and was the most technically advanced installation to that time. The line had six four-car trains, and featured centralized traffic control (<CTC>) and automatic train operation (<ATO>); trains were dispatched by computer but driven manually. Traction current was supplied at 1500V dc. The maximum permitted speed was 50 km/h (31 mph) .

VI. The Large-Scale Prototypes

東京 T ō ky ō 東京モノレール T ō ky ō Monorail

Supported system: <Monorail>-Hamamatsu-chô ( モノレール浜松町 ) to Haneda-kûkô-dai-ni-<biru> ( 羽田空港第2ビル ), 17.6 km (10.9 mi) . Opened 1964.

Fare

Up to

Equivalent per km (per mi)

$1.20

1.5 km (0.9 mi)

$0.80 ($1.30)

$1.60

4.5 km (2.8 mi)

$0.40 ($0.60)

$2.20

7.4 km (4.6 mi)

$0.30 ($0.50)

$2.70

10.5 km (6.5 mi)

$0.25 ($0.40)

$3.30

13.5 km (8.4 mi)

"   "

$3.90

16.9 km (10.5 mi)

"   "

The Tôkyô Monorail, built to connect the Ginza-Yûrakuchô business hub with Haneda Airport, was the first attempt to apply monorail technology to a major public transport facility in Japan. It has operated successfully for 40 years, for much of that time as a self-supporting enterprise.

The Tôkyô Monorail was not the first "urban transport" monorail in Japan. It was built as an "airport access railway" with no intermediate stations. It retains the "airport access railway" classification today although it now has several intermediate stations to serve on-line development. The Japanese regard the Kitakyûshû Rapid Railway, opened in 1985, as the country's first "urban transport" monorail line.

The Tôkyô Monorail was built to provide a fixed link to Haneda Airport in time for the 1964 Summer Olympic Games, held in Tôkyô. However, private interests believed that airport traffic at that time was not sufficient to justify a rail link - correctly, as things turned out. However, supplier Hitachi was willing to finance monorail construction.

Haneda Airport was built in an area once served by an electric railway branch, cut back after World War II but eventually re-extended to serve the airport. The civilian airfield, established in 1931, became a military airbase several years later and was taken over by the U.S. military in 1945. It was returned to Japanese control in 1952, and the Transport Ministry began building Tôkyô International Airport in 1954.

The rail spur was owned by today's Keihin Electric Express Railway ( 京浜急行電鉄 ), or Keikyû ( 京急 "kay-cue"). It terminated within sight of the airport terminal, but the company believed that the cost of an extension could not be justified. Air traffic accounted for a tiny fraction of all intercity transport during the 1950s and early 1960s, and air passengers would not bring much additional revenue. Instead, Keikyû and Japan Air Lines started an express bus service to Tôkyô station when the airport opened in 1955.

Planning for the 1964 Tôkyô Olympics started in 1959. Keikyû considered an underground extension to the airport but did not pursue this idea. Back then, Keikyû trains terminated at Shinagawa, south of central Tôkyô. The long-planned metro to Shinagawa, used by Keikyû trains today, was under construction but not complete.

A group of investors with ties to the Alweg firm joined with Hitachi, which had acquired license rights to Alweg technology in 1960. The Tôkyô Monorail Co., Ltd., received its concession in 1961 and began construction in 1963. It was financed exclusively by private investors, with no participation by the state, the airport authority or the aviation industry. The line as built extended 13.2 km (8.2 mi) . The nominal construction cost (without attempting to adjust for inflation) was ¥21.1 thousand million ($60 million) , ¥20 thousand million for infrastructure and ¥1.1 thousand million for rolling stock.

Supplier Hitachi was undoubtedly well aware of the tenuous prospects for short-term profits. However, it certainly concluded that benefits - a major showcase for Hitachi-<Alweg> technology, and long-term profits as airport traffic grew - justified the risk.

The Hamamatsu-chô terminal is 3 km (2 mi) south of the Ginza-Yûrakuchô hub. This location was selected for economy reasons, but is easy accessible from most offices and hotels by Yamanote Line trains or taxi. The monorail was built along the railway, canals, and tidal areas reclaimed from Tôkyô Bay. The line has a short tunnel under a ship channel, and the original terminal had a single-beam tunnel beneath runways to a station below the main ticket counters.

The monorail had no intermediate stations when built, a fact which demonstrated that airport traffic alone could not support the line. A toll expressway to Haneda, also completed for the Olympics, provided strong competition. One intermediate station was added in 1965 to serve the Ôi Racetrack, but the line was still not able to earn a profit. The company was merged into the Hitachi group in 1967 as "Hitachi Transport Systems, Tôkyô Monorail" ( 日立運輸東京モノレール ) eliminating all outside investment.

Traffic at Haneda Airport grew from 3.9 million at 1965 to 49.3 million at 1997, despite relocation of most international flights to Narita Airport in 1978. By this time, Haneda was the world's sixth busiest airport. Annual monorail traffic grew from three million to more than 60 million per year during the same period, owing in part to gradual addition of new stations to serve on-line development. The line currently has seven intermediate stations. The monorail became profitable in 1972, and resumed "independent" operation as Tôkyô Monorail Co., Ltd., in 1981. Hitachi Transport Systems remained the sole shareholder until very recently.

The Tôkyô Monorail enjoyed a 60 percent market share of airport traffic for many years, but plans for airport expansion finally attracted the attention of Keikyû management.

In 1983, the Transport Ministry began a project to expand Haneda Airport from an annual capacity of 22 million passengers annually to 85 million. It built new terminals 2.4 km (1.5 mi) east of the original. Tôkyô Monorail built a 5.2-km (3.2-mi) extension to the new west terminal. This opened in 1993, and the 1.0-km (0.6-mi) segment to the old terminal was closed at the same time. The new tunnels beneath the runways were built by the state and leased to Tôkyô Monorail for an annual payment of 2.5 percent of appraised value. At the end of construction (1993), the cost was stated as ¥61.6 thousand million, including ¥ 43.7 thousand million for tunnels, viaducts and guideways, ¥7.6 thousand million for electrical and other equipment, and ¥ 10.3 thousand million for improvements to the existing line. The final cost (including interest during the construction period) was ¥67.6 thousand million (about $900 million in 2002 dollars) . Fifteen percent was paid by the state, and the remainder was financed by loans, with interest subsidized by central and local authorities.

Also in 1983, Keikyû secured authority to build an underground extension to the airport terminals. It started construction in 1988, opened a new underground station near the airport in 1993, and completed the project at the end of 1998. Estimated cost at the start of construction ¥93 thousand million (about $700 million in 2002 dollars) , with 17.5 percent paid by the state. Keikyû borrowed the remainder from the Japan Development Bank (a public corporation, i.e. a government agency), and pays an annual rent equal to 2.3 percent of appraised value for the tunnels within the airport perimeter. The extension was anticipated to increase traffic on the branch (long known as the "Airport Line" even though trains did not enter the airport) from 28,000 to 35,000 passengers daily.

At 1997, prior to opening of the Keikyû extension, the monorail carried about 77,000 airport passengers per day. About 49 percent of all monorail passengers were airport passengers (Hirota).

The monorail is faster, and cheaper, for passengers traveling to and from Hamamatsu-chô. Travel time from the nearest metro station (Daimon) is 28 min, compared to 22 min by monorail, and the combined metro-Keikyu fare is about $5, compared to about $4 by monorail.

However, Hamamatsu-chô is not a major "destination." The monorail's cost and time differences disappear for passengers continuing north to major destinations such as Shimbashi, just one minute north of Daimon by metro or (two minutes by JR Yamanote Line from Hamamatsu-chô). Through trains from the Keikyû network continue over metro tracks to major destinations such as Ginza and Asakusa, then by connecting railways to points as far as Narita Airport. Keikyû now operates direct service to points south, connecting the airport with Kawasaki and Yokohama.

The Tôkyô Monorail is currently operating its fourth generation of rolling stock, all built by Hitachi. The line opened with 47 cars and two diesel shop switchers. The early cars were 10.8 meters (35' 5") long, and were coupled in three-car formations. A photo of a test run one month prior to opening shows a nine-car train. Cars purchased after 1969 were 15.2m (49' 10") long. Air conditioning was introduced in 1982. Today, the line has 114 aluminum-bodied cars, permanently coupled in 19 six-car trains. The newest vehicles are 3.0m (9' 11") wide overall, 4.5m (14' 10') high overall, 2.8m (9' 4") over the support beam top surface, and 2.3m (7' 5") over the passenger compartment floor.

Guideway beam cross-section dimensions are 1.4m (4' 7") high x 0.8m (2' 7") wide. Traction current is supplied at 750V dc. Performance specifications include: acceleration 3.1 km/h/s (1.9 mph/s) , service braking 3.5 km/h/s (2.2 mph per sec) , emergency braking 4.5 km/h/s (2.8 mph per sec) .

The minimum interval between trains is 3 min 20 sec, which is operated during the a.m. peak. However, this is not sustained over a 60-minute interval. The maximum service level is 19 trains per hour per direction (thd), which is typical of Japanese practice. Japanese rail systems avoid operation of headways shorter than 3 min when possible.

The minimum headway is set by the configuration of Hamamatsu-chô terminal, which is single-beam. A planned new double-beam terminal would permit a minimum headway of 2 min. The original Haneda terminal had two beams, but the 0.8-km (0.5-mi) tunnel leading to it had a single beam.

The company progressively increased midday service as traffic grew: from 10 to 8 min in 1970, to 7 minutes in 1971, to 6 min in 1973, and to 5 min in 1985. The new, longer "bogie" stock acquired from 1969 was operated in four-car trains until completion of platform lengthening in 1974. All trains were lengthened to six cars with the July 1983 timetable change. Following completion of automatic platform gates, the monorail was changed to driver-only operation from late September 2002.

The maximum hourly traffic volume is reported at 10,512 phd. As stated above, the maximum service level is 19 thd, and each six-car train is 93.6 m (307 ft) long. This works out to 92 p/v and 5.9 p/m, averaged over the busiest hour. These statistics are not remarkable for Japan - but are 20-50 percent higher than the 4 to 5 p/m "maximum" for most U.S. and Canadian cities. In order to carry 10,512 American or Canadian consumers per hour, the Tôkyô Monorail would have to provide 20 to 50 percent more peak-period service than it does - and can - today.

The East Japan Railway ("JR-East"), one of the privatized regional successors to the Japanese National Railways (JNR), announced in December 2001 that it would purchase the majority of Tôkyô Monorail stock from Hitachi Transport Systems. Under the agreement, JR-East was to purchase 70 percent of monorail stock for ¥7 thousand million (about $60 million). The remaining 30 percent was to be purchased by Hitachi, Ltd., parent of the Hitachi Group, for ¥3 thousand million (about $25 million, an amount equal to the company's capitalization). The decision to sell was prompted by high debt (¥50 thousand million, about $420 million), and need for capital investment that Hitachi wished to avoid. Newspapers reported that the monorail carried about 138,000 passengers per day at the end of 2001, down by 22 percent from the annual average for the 1997 fiscal year. The annual average for the 2003 fiscal year was 128,000 passengers per day.

Keikyû has conducted aggressive marketing campaigns since completing its extension (or "re-extension") to Haneda Airport at the end of 1998. Keikyû competition hurts JR-East as well as the Monorail, for 70-80 percent of Monorail passengers change to JR Yamanote Line trains at Hamamatsu-chô. The sale gives JR-East "access" to Haneda Airport - or, more precisely, control over its connection to Haneda Airport. JR-East improved connections between Yamanote Line and monorail trains, offered through discount tickets to the airport, and extended the validity of its Suica farecard to the monorail.

The company opened an extension of 0.7 km (0.4 mi) to the new Haneda Airport Terminal 2 on 1 December 2004. At 1993, the second-stage monorail extension was estimated to cost ¥17.7 thousand million. The new terminal is also served by the existing Keikyû station.

The Tôkyô Monorail is the world's busiest airport rail link and will certainly remain in operation for many years. However, the days of steadily increasing monorail traffic have ended. The national economy is mired in recession, and there is little prospect for short-term improvement. The long-term future does not look promising, since various new rail lines are planned to reach Haneda. Things might improve under JR-East control, owing to improved coordination with JR trains, promotion as part of the JR metropolitan rail network, and through-ticketing arrangements.

Additional rail services will reach Haneda within the next decade. A new metro line, paralleling the west side of the Yamanote loop line to serve major centers such as Ikebukuro, Shinjuku and Shibuya is under construction, and is planned for completion by 2007. This will connect at Shibuya with the Tôkyô Express Electric Railway, permitting regional through services from northwestern points to Kawasaki, Yokohama, and Kamata. A short connecting link to the Keikyû line is planned as a medium-term project. Through service to Haneda Airport would require either dual-gauge track (Keikyû uses standard gauge; the new metro will use 1,067 mm (3'6") gauge) or perfection of <free gauge> rolling stock that can pass between lines of different gauges while in motion. Long-term projects include passenger service on an underground freight bypass near Haneda Airport, and a new "middle-peripheral" rail line that will eventually reach Haneda. All of these projects will use conventional rail technology.

Tôkyô Monorail once planned extensions from Haneda to Yokohama (18 km / 11 mi ) and to Kamata (4 km / 2.5 mi ), but did not secure authority for these. The company relinquished its license to build northward from Hamamatsu-chô to Shimbashi in 1966. JR-East announced at the end of 2001 that it would study a monorail extension to Shimbashi. An underground extension to Shimbashi and Tôkyô station would provide better connections with various JR services, but would be extremely expensive to build - ¥50-100 thousand million, according to an estimate released early in 2002. The high cost gives the appearance of a long-term project, one not likely to advance until Japan's economy improves.

Two additional points deserve comment. Sheer market size and traffic volume play an important role in facilitating profitable operation of enterprises such as the Tôkyô Monorail. The Tôkyô metropolitan region houses roughly 30 million people within a 50-km (31-mi) radius of Tôkyô station (claimed as the largest agglomeration of people, and economic activity, in human history). An estimated 2.5 million people commute to jobs in Tôkyô's three central wards each weekday. Along major transport corridors, traffic volumes are high enough to justify parallel tracks, and lines, to an extent unimaginable anywhere else. Tôkyô's busiest transport corridor extends southward from Tôkyô station, and includes nine pairs of tracks within an area about 0.8 km (0.5 mi) wide. These include two "urban" metro lines and a third underground line built for the "railway" network. On the surface, the Tôkaidô Main Line has three pairs of tracks, and one pair for Tôkaidô Shinkansen trains, which now carry substantial short-distance travel. Elevated structures carry the newest addition, the Yurikamome <NTS> line and the Tôkyô Monorail.

The monorail's profitability reflects the economic environment in which it operates. During the 2000 fiscal year, Tôkyô Monorail passengers paid an average of $0.22 per km ($0.35 per mi) in fares. By contrast, New York City Transit and San Francisco Bay Area Rapid Transit District (BART) passengers paid $0.10 per km ($0.16 per mi) . If BART had collected $0.22 per km ($0.35 per mi) from each passenger, it would have returned an operating surplus of about $70 million. If BART had also increased its traffic density to that carried by the Tôkyô Monorail, the surplus would have approached $500 million. If NYCT had accomplished similar feats, it would have returned an operating surplus exceeding $1 billion. (Metro operating surpluses are not unknown in Japan, and were reported by five of the country’s ten operators for the 2000 fiscal year, and by seven of the ten operators for the 2002 fiscal year).

TABLE 4: JAPANESE MONORAIL ROLLING STOCK FLEETS

Operator

Route Length

Rolling Stock (cars)

Formations (trains)

Maximum Train Length

Chiba

15.2 km / 9.4 mi

40

20 two-car

four cars

Inuyama - Nagoya RR

1.2 km / 0.7 mi

6

3 two-car

six cars

Kitakyûshû

8.8 km / 5.5 mi

40

10 four-car

four cars

Naha

12.9 km / 8.0 mi

24

12 two-car

four cars

Ôsaka

23.8 km / 14.8 mi

52

13 four-car

four cars

Shônan

6.6 km / 4.1 mi

21

7 three-car

three cars

Tôkyô Maihama

5.0 km / 3.1 mi

30

5 six-car

six cars

Tôkyô Monorail

16.9 km / 10.5 mi

114

19 six-car

six cars

Tôkyô Tama

16.0 km / 9.9 mi

60

15 four-car

four cars

鎌倉 Kamakura 湘南モノレール Sh ō nan Monorail

Suspended system: Ôfuna ( 大船 ) to Shônan-Enoshima ( 湘南江の島 ), 6.6 km (4.1 mi) . Opened 1970.

Fare

Up to

Equivalent per km (per mi)

$1.40

1.9 km (1.2 mi)

$0.70 ($1.10)

$1.70

3.5 km (2.2 mi)

$0.50 ($0.80)

$2.00

5.0 km (3.1 mi)

$$0.40 (0.60)

$2.20

5.5 km (3.4 mi)

"   "

$2.30

6.0 km (3.7 mi)

"   "

$2.50

6.6 km (4.1 mi)

"   "

This line was built to provide improved transportation to an area, southwest of Tôkyô, which had considerable residential and commercial development but no local rail line. It terminates at Enoshima, a seaside resort town. Enoshima already had a rail connection to Tôkyô and a local electric railway, but the monorail provides useful additional capacity during peak travel periods.

"Interurban" monorail lines had been proposed in Japan since the 1920s, but this line has the character of a suburban connector. It was built over the area's major transport corridor, a two-lane road built by the Keihin Electric Express Railway (Keikyû) but open for toll-free public use. (Privately financed roads, toll and free, are not unknown in Japan.)

The Shônan Monorail ( 湘南 Shônan is a regional name) was also built as a full-scale prototype for suspended monorail technology in Japan, with substantial supplier financing. In this respect, it is the Safege-sysem analogue of the Alweg-system Tôkyô Monorail. Mitsubishi, the Japanese licensee for Safege technology, organized the company and secured permission to build between Ôfuna, southwest of Yokohama, and Enoshima.

Major shareholders include:

Mitsubishi Heavy Industries, Ltd.    55 percent of shares.

Mitsubishi Electric Corp., Ltd.    18 percent.

Mitsubishi, Ltd.    18 percent.

Nippon Steel Corp., Ltd. (world's largest steelmaker)    2 percent.

Keihin Electric Express Railway Co., Ltd.    1 percent.

Nippon Kôkan, Ltd. (Japan's second-largest steelmaker)    1 percent.

The Shônan Monorail extends 6.6 km (4.1 mi) between terminals. Because it was built along a local road, the monorail has relatively sharp curves and grades to 7.4 percent (1 in 14) . The line also has two short tunnels, required by local geography. It is single-beam with passing sidings at four of the six intermediate stations. Both terminals have single beams with a platform on either side. Trains operate with two-man crews, and the intermediate stations are unstaffed. Traction current is supplied at 1500V dc. The nominal construction cost (without attempting to adjust for inflation) was ¥5.3 thousand million.

The Shônan Monorail provides an interesting ride and demonstrates, among other things, that there is such a thing as a practical monorail "switch" (as opposed to "turnout"). On the other hand, there is no prospect for extension, not even 1 km (0.6 mi) farther south to Enoshima island. This link was planned as a monorail line as long ago as 1927 and again during the early 1960s.

VII. Unrealized Plans

The formative years of monorail development in Japan coincided with plans for major investment to upgrade urban transport. After World War II, tramway lines in bomb-devastated cities were restored with relatively little investment. Large numbers of composite-bodied cars, with sturdy but obsolete hardware, were built to replace the thousands damaged or destroyed during the 1945 firebomb attacks. However, trams could not continue operation indefinitely without investment large-scale modernization and renewal. Transport and finance officials eventually decided that this investment could not be justified. Local and central authorities cited population shifts, falling ridership, financial difficulties and rapidly rising road congestion as factors requiring investment in some other mode.

Large Japanese cities began to consider tramway replacement during the mid-1950s. Trolleybuses and motorbuses required much less capital but were not adequate for busy trunk routes. Metros were the obvious choice for this application. Tôkyô, Ôsaka and Nagoya had long-standing plans for comprehensive networks, but progress was slow because of financial constraints. This generated some interest in monorail technology, but planners concluded that monorails were not suitable for the busiest trunk lines in Japan's largest cities. Ôsaka began replacing tramcars with trolleybuses in 1961, then decided to replace all remaining trams with motorbuses in 1966. Kôbe decided on tramcar replacement in 1965, followed by Nagoya in 1966. In Tôkyô, the municipal transportation bureau ( Toei ) invested considerable sums for temporary track to maintain tramcar service during service during metro construction, for permanent track after construction was finished, and for new track as part of street widening projects. This stopped in 1965, and Toei announced a five-year plan to replace all surface electric transport in 1967. Kyôto, the single holdout among the six large municipal transport operators, began tramcar replacement in 1970.

Japanese planners chose metros in corridors where traffic justified investment for new urban transport facilities. Short test lines and even the Tôkyô Monorail demonstrated that monorails could not carry the anticipated peak-period traffic volumes (Tôkyô metro lines carry up to eight times more traffic during the busiest hour than the Tôkyô Monorail). In addition, monorails are not compatible with conventional rail lines, and capability for through operation was an important consideration. In Tôkyô, plans date to the 1930s for extending operation of suburban trains over metro tracks. Implementation was spurred after WWII by the large and growing numbers of passengers changing between suburban and urban rail services at major interchange stations such as Ikebukuro, Shibuya and Shinjuku.

A plan for a new transport line in the Nagoya illustrates the importance given by planners to through-running capabilities - and how this placed monorail at a relative disadvantage. The Nagoya Railroad was interested in monorail development, no doubt stimulated by its Monkey Park Monorail described above. A rail line extending due east from Nagoya would have served an area of potential suburban development, but construction through the built-up area in Nagoya proper would have been very costly. The company considered a 21-km (13-mi) monorail from Yagoto, in southeastern Nagoya, eastward to the automaking center of Toyota. This would have connected with a planned metro line at Yagoto, and with an existing Meitetsu line at Toyota. However, passengers traveling to central Nagoya would have been forced to change at Yagoto, and the anticipated volume of traffic was sufficient to justify through running. Therefore, a conventional rail line was built as a joint project by Nagoya city and the Nagoya Railroad. The metro Tsurumai Line, using 1067-mm gauge track and 1500V dc overhead current collection, was built to the municipal boundary at Akaike, 5.3 km (3.3 mi) beyond Yagoto. From Akaike, the Nagoya Railroad built its Toyota New Line 15.2 km (9.4 mi) eastward to Toyota. This project was completed in 1979. Later, the metro was extended northward to a connection with the Nagoya Railroad Inuyama Line, provided a much-needed alternate route through central Nagoya.

Other unrealized plans include:

--A short excursion line at Atami, southwest of Tôkyô, connecting Atami station with the base station of an aerial cableway ( ロープウェイ <ropeway> ), 2.1 km (1.3 mi) . The Atami Monorail Co., Ltd., ( 熱海モノレール ) received a concession in 1963 but was not able to finance construction.

--Short excursion lines at Arashiyama (west of Kyôto), Hiroshima, and Shingû (on the Kii Peninsula between Nagoya and Ôsaka).

--Short lines in the Tôkyô region. One of these was planned to connect the Tôkyô Monorail terminal at Hamamatsu-chô with Tôkyô Tower. Another was planned in Narita, to connect Narita station with the Shinshôji, a Shingon Buddhist temple known popularly as Narita-san. (A small tramway line once served this market.)

Planned long-distance lines included:

--A 32-km (20-mi) line extending from Gifu southwest to Yôrô, with a 11-km (7-mi) branch from Usa to Hashima, studied by the Nagoya Railroad Co., Ltd. An estimate, probably dating to the early 1960s, placed the cost of building 19 km (12 mi) of double-beam line at $22.5 million, more than $1 million per km (nearly $2 mn per mi) ; in 2002 dollars, $130 mn, nearly $7 mn per km ($11 mn per mi) . This proposal evidently envisioned construction along the Nagara River - and, as such, seems to have been the "solution in search of a problem." This is illustrated by the following example:

One of the planned markets was to connect Gifu with the original Tôkyô - Ôsaka high-speed railway. This line, the Tôkaidô Shinkansen, bypassed Gifu some distance to the west. A station named Gifu-Hashima was built within Gifu Prefecture for political reasons. However, Nagoya station is just 31 km (19 mi) away, has many more shinkansen services than Gifu-Hashima, and has frequent service to Gifu by Nagoya Railroad trains. Most Gifu passengers preferred to make shinkansen connections at Nagoya. The area around Gifu-Hashima station developed very slowly. Not until 1982, 18 years after shinkansen service began, did the Nagoya Railroad build a 1.5-km (0.9-mi) spur from an existing line to Gifu-Hashima.

--Two Safege-system monorails proposed by Nippon Airways Development, extending from Ôtemachi, near Tôkyô station: one 23 km (14 mi) west to Mitaka, the other 50 km (31 mi) east to to Chiba and Goi. These were proposed for construction apparently along toll expressways.

Urban monorail proposals were floated for a number of cities, including Fujisawa, Fukuoka, Gifu, Hiroshima, Kawasaki, Kitakyûshû, Kôbe, Kumamoto, Kyôto, Nagoya, Okayama-Kurashiki, Sendai, Shizuoka-Shimizu, Takamatsu, Tomakomai (Hokkaidô) Tôkyô and Utsunomiya. A circular monorail for Tôkyô was proposed to parallel much of the Yamanote Line, for much of the distance along Meiji-dôri, a peripheral road once served by Tôkyô's longest trolleybus line. Fukuoka, Kôbe, Kyôto and Sendai built metros designed for through service with connecting rail lines. Nagoya and Tôkyô continued metro expansion, building lines designed for through service. Kitakyûshû eventually built the first "urban" monorail in Japan. This was not the start of a Japanese monorail "revival," as stated by some non-Japanese sources, but the first application of monorail after the initial periods of development, refinement and adoption of standards.

Fukuoka (1.1 million) provides a useful example of site-specific factors that tend to discourage monorail construction. The city is the capital of Fukuoka Prefecture, and the business, commercial and transportation hub of Northern Kyûshû. The principal rail station (which is named "Hakata") is located about a mile south of the business center, and Fukuoka Airport is located about two mi) south of the station. The rail line extending westward from Fukuoka, the Chikuhi Line, had a poorly-located entrance to Fukuoka and a very poorly-located entrance to Karatsu (80,000), a regional center about 50 km (30 mi) to the west. The long-established Kyûshû University is located about 3 km (2 mi) east of the center. Two km (1 mi) mile farther east, at Kaizuka, is the terminal of an independent rail line, the Miyajidake Line of the Nishi-Nippon Railroad Co., Ltd. (Nishitetsu).

Over a period of 15 years, Fukuoka built a 1067-mm (3’6”) gauge metro network to link these and other destinations (including the "main" Nishitetsu terminal, at Tenjin). The major line extends north from Hakata station, then turns west to Tenjin and Meinohama, roughly 8 km (5 mi) . Here, the line connects with the JR-Kyûshû Chikuhi Line, which received 1500-volt DC electrification and a new entrance, on concrete viaduct, to Karatsu. The other branch extends to Kaizuka. The surface-level passenger interchange here will eventually provide through running for Miyajidake Line. This will occur once traffic grows to justify the investment needed to upgrade the Nishitetsu line. Total route length, including an extension from Hakata station to the airport, is about 16 km (10 mi) . Monorail alternatives could not have provided through-running access to central Fukuoka for Chikuhi Line and (eventually) Miyajidake Line trains.

TABLE 5: JAPANESE MONORAIL CONSTRUCTION AND OPERATING DETAILS

Operator

Route Length km / mi

Scheduled Running Time Between Terminals

Passenger (commercial) Speed

Maximum Permitted Speed

Maximum Grade

Minimum Curve Radius

Chiba

L 1: 3.2 / 2.0

L 2: 12.0 / 7.4

10 min

26 min

20.2 km/h

12.5 mph

30.0 km/h

18.6 mph

65 km/h

40 mph

6 percent

50 m

164 ft

Inuyama -

Nagoya RR

1.2 / 0.7

4 min

18 km/h

11 mph

40 km/h

25 mph

9.7 percent

 

Kitakyûshû

8.8 / 5.5

19 min

27 km/h

17 mph

65 km/h

40 mph

4 percent

80 m

263 ft

Naha

12.9 / 8.0

27 min

28.1 km/h

17.4 mph

65 km/h

40 mph

6 percent

 

Ôsaka

ML:21.2 / 13.1

BL:2.6 / 1.6

36 min

5 min

35.0 km/h

21.7 mph

29.4 km/h

18.2 mph

75 km/h

46.5 mph

6 percent

100 m

328 ft

Shônan

6.6 / 4.1

14 min

28.9 km/h

17.9 mph

75 km/h

46.5 mph

7.4 percent

50 m

164 ft

Tôkyô Maihama

5.0 / 3.1

single beam

13 min

24.0 km/h

14.9 mph

     

Tôkyô Monorail

16.9 / 10.5

22 min

40 km/h

25 mph

80 km/h

50 mph

6 percent

120 m

394 ft

Tôkyô Tama

16.0 / 9.9

36 min

26.9 km/h

16.7 mph

65 km/h

40 mph

5.8 percent

100 m

328 ft

VIII. Standards Adopted For Supported and Suspended Monorails

Monorail suppliers and operators organized the Japan Monorail Association ( 日本モノレール協会 nippon <monorail> kyôkai ) and began large-scale research and development in 1967. The goal was to establish design and application standards for monorail technology in Japan. The first major result was establishment of standards for supported monorails ( 跨座型モノレール kozagata-<monorail> ) in 1968. These include rubber tires, bogies with two driving axles at either end of each vehicle, and passenger compartment mounted entirely above driving and guide wheels to maximize interior space. The first monorail built to these standards was the Expo '70 world's fair line in Ôsaka (above).

The Shônan Monorail is considered the first of Japan's "second-generation" monorail lines. It is true that this line was built after the commencement of monorail research and development in 1967. However, it is reasonable to describe it as a full-scale prototype, for it served as the basis for JMA standards for suspended monorails ( 懸垂型モノレール kensuigata-<monorail> ).

The proprietary nature of various new transit technologies is a major concern in the U.S., particularly so following the experience of Jacksonville, FL. This city purchased proprietary technology for the first stage of its "Automated Skyway Express." When the time came to build the second stage, the original supplier's bids were so high that the operator scrapped the original system, then purchased a replacement proprietary system from a different supplier.

As a practical matter, monorail and <NTS> technology are not "proprietary" in Japan, at least not in the U.S. sense. Any supported monorail, suspended monorail or <NTS> facility built with public investment must conform to design standards for that mode. It is true that supported monorail is Hitachi's domain, and that suspended monorail is Mitsubishi's domain. However, the relationship among suppliers, operators and state transport and finance ministries is much different than in the U.S. State authorities have, and use, the "power of persuasion" to encourage suppliers to cooperate with each other, and with transport operators, "for the good of all concerned" - that is, to secure lower costs. Given the importance of consensus and cooperation in Japanese culture, it is very difficult to imagine a situation similar to the one faced by Jacksonville would occur in Japan.

Various Japanese rail operators often divide large orders for rolling stock among several carbuilders. Kawasaki Heavy Industries, Ltd., has shared recent some orders for supported monorail stock with Hitachi, Ltd.

IX. Mature Technologies Gain Application

北九州 Kitakyûshû

北九州高速鉄道小倉線 kitakyūshū kōsoku tetsudō kokura sen

Kitakyūshū Rapid Railway Co., Ltd., K okura Line

Supported system: Kokura ( 小倉 ) to Kikugaoka ( 企救丘 ), 8.8 km (5.5 mi) . Opened 1985.

Fare

Up to

Equivalent per km (per mi)

$1.30

0.5 km (0.3 mi)

$2.60 ($4.30)

$1.40

0.8 km (0.5 mi)

$1.75 ($3.50)

$1.60

3.2 km (2.0 mi)

$0.50 ($0.80)

$1.90

4.8 km (3.0 mi)

$0.40 ($0.60)

$2.20

7.3 km (4.5 mi)

$0.30 ($0.50)

$2.40

8.8 km (5.5 mi)

$0.25 ($0.40)

The "Kitakyûshû Rapid Railway, Kokura Line," was the first "urban transport" monorail in Japan. The Tôkyô Monorail was built as an "airport-access railway" and this remains its primary function.

No two cities are exactly alike, but Kitakyûshû ("key-tuh-cue-shoe," = "North Kyûshû") stands out as unique in Japan. It grew up as the country's major steelmaking center, as five separate cities that were not amalgamated until 1963. It sprawls out over more than 30 km (20 mi) east to west. Heavy industry has become less important in recent years, but Kitakyûshû retains a highly industrialized cityscape.

The city's principal transport corridor extends from east to west. Until 1985, this was served by trams operated by the Nishi-Nippon Railroad Co., Ltd., ( 西日本鉄道 ) known popularly as Nishitetsu ( 西鉄 "Nish-tets"). Prolonged, inexorable traffic declines, because of population shifts, falling industrial employment and railroad competition, brought about motorbus substitution in 1985 and 1992; the last vestige was replaced in 2000.

The "railroad competition" mentioned above became far more formidable after JNR electrified its Kagoshima Main Line in 1961. Today, JR-Kyûshû operates three local and three "rapid-service" trains per hour through Kitakyûshû, a "rapid-transit" or S-Bahn service in all but name. These trains provide commercial speeds exceeding 50 km/h (30 mph) .

TABLE 6: JAPANESE MONORAIL SERVICE DETAILS

Operator

Route Length km / mi

Through Fare

Service Hours

Midday Service Frequency

Down (outbound) Services

Weekday /

Sun-Hol

Up (inbound) Services Weekday / Sun-Hol

Chiba

 - Line 1

3.2 / 2.0

$2.25

5:30 am -

11:50 pm

10 min

126 / 109

127 / 110

Chiba

 - Line 2

12.0 / 7.4

$3.75

5:30 am -

midnight

10 min

124 / 132

123 / 130

Inuyama - Nagoya RR

1.2 / 0.7

$1.25

8:50 am -

5:20 pm

30 min

18

18

Kitakyûshû

8.8 / 5.5

$2.40

6:00 am -

11:30 pm

6-10 min

103 / 94

103 / 93

Naha

12.9 / 8.0

$2.40

6:00 am -

11:30 pm

10-12 min

101

101

Ôsaka

- Main

21.2 / 13.1

$4.50

5:45 am -

11:30 pm

10 min

110 / 102

108 / 101

Ôsaka

- Branch

2.6 / 1.6

$2.00

6:25 am -

11:35 pm

20 min

50 / 49

51 / 49

Shônan

6.6 / 4.1

single beam

$2.50

5:30 am -

11:30 pm

7.5 min

133 / 113

133 / 113

Tôkyô

Maihama

5.0 / 3.1

single beam loop

$1.70

6:00 am -

11:59 pm

6 min

   

Tôkyô Monorail

16.9 / 10.5

$3.90

5:00 am -

11:30 pm

4-5 min

253 / 234

255 / 236

Tôkyô Tama

16.0 / 9.9